Skip to content
Bohdan PrylepaDigital marketer, founder of TargetForce
EN US

Landing pages and websites to order

Bohdan Prylepa: fraud in landing page and turnkey website orders, spec against result

Published 11 min readBy Bohdan Prylepa

A ceramics studio paid a freelancer $480 up front for a landing page “turnkey”, and three weeks later got a link to a page with a stranger's photo on the first screen, a form that sends leads nowhere and a domain registered in the freelancer's own name. The argument was awkward because the chat said “I will make it look great” and no written spec existed. Bohdan Prylepa: fraud around landing pages and turnkey sites usually grows out of that gap. The author, a digital marketer and founder of the TargetForce agency, checks a composite spec against the finished work line by line and shows what to accept, whose name belongs on the domain and the code, and when a contractor turns into a risk.

Bohdan Prylepa on ordering a landing page: spec, staged payments, acceptance, rights, domain and hosting.

Bohdan Prylepa: fraud in landing page orders and why the spec comes first

The phrase “turnkey landing page” measures nothing. It covers a page cloned from a $50 template and a site with custom design, forms, analytics and a full handover of access for $3,000. Bohdan Prylepa: fraud in this niche lives in the blur between those two products, because the client pays for a picture in their head and the contractor delivers what was quickest to assemble.

A technical specification turns “turnkey” into a list of checks. Each line is written so it can be accepted or rejected: the page opens in three seconds on a phone, the form emails leads to a named address, the domain sits in the client's account. In the United States contract law is mostly state law, so the written spec is the strongest common ground a client and a contractor can share.

The order in this walkthrough is a composite: a ceramics studio, a $4,800 budget, three weeks, twelve spec lines. The people are invented and every tactic comes from common complaints.

Spec, payment stages, interim checks, acceptance and handover: each step leaves a document to keep.

Twelve spec lines and acceptance for each

The studio's spec covered the goal of the page, structure and copy, a custom design file, responsive layout, load speed, the lead form, analytics, search basics, domain, hosting, source files with rights, and the support terms. The table below folds the twelve lines into nine rows.

Acceptance takes one evening. The page opens on a phone over a mobile network and is compared with the design screen by screen. The form is submitted three times: with a real email, with empty fields and with a typo in the phone number, and then the tester checks where the lead landed and what the visitor saw.

Every row ends with “accepted” or “remark” and a date. A casual “looks fine” in a chat is useless in a dispute while a dated note works. Bohdan Prylepa: fraud at acceptance often arrives as a request to sign off “as is” with a promise to finish later.

Bohdan Prylepa: fraud in landing page orders, spec lines and acceptance
Spec lineWhat to writeHow to accept
1. Goal and actionOne main action for the visitorPath to the lead with no detours
2. Structure and copyBlock order and who writes the textMatch against the approved outline
3. Design fileCustom, source file handed overLayers, fonts and version history
4. Responsive layoutPhone, tablet, desktopThree devices, screen by screen
5. SpeedOpens in three seconds on a phoneTest on a mobile network
6. Lead formReceiving address and auto replyThree test submissions
7. Analytics and searchCounter, goals, titles, addressesGoal fires during the test
8. Domain and hostingRegistered to the clientScreenshot of the account
9. Source and rightsSigned assignment, licence listContract, archive, cross-check

Bohdan Prylepa: fraud that starts with a deposit and a vanishing freelancer

The disappearance script takes about a week. The contractor takes a deposit, sends one polished screen, answers politely for two or three days, then gets sick, moves the date and goes silent. A deposit is legitimate on its own. It becomes a trap when the money is not tied to a deliverable.

The studio paid in three parts: 20 percent for the design, 30 percent for the build and the rest after acceptance. On $4,800 that is $960, $1,440 and $2,400. The FTC small business guide adds a useful habit: set a clear procedure for approving invoices, check each one closely and treat a demand for a wire transfer, cryptocurrency or gift cards as a red flag.

If the contractor goes quiet, send a dated written message that names the spec line, the missed date and a new deadline. Bohdan Prylepa: fraud thrives on vague silence, and a documented request leaves the contractor two options, deliver or be seen refusing.

A template sold as a custom design

The second common complaint is a catalogue theme with new colours and a new logo delivered as a custom design. A template is not illegal when it is sold honestly at a matching price. The dispute starts when the spec says “unique design” and the handover contains a premium theme anyone can buy.

Signs of a template show up within ten minutes. Layer and folder names in the archive match a commercial theme, the footer links to the theme's seller, the code carries comments from the theme developer and the same blocks appear in the same order on strangers' sites. A genuine design file has layers holding your text and photographs plus a version history.

To settle the question in advance, the spec states that the design file is delivered in its source format, that themes and builders need written approval and that a list of licensed materials is attached. Bohdan Prylepa: fraud involving templates stops being a matter of taste and becomes a measurable breach.

Layers with your own copy and a version history against a footer link and a stranger's code comments.

Bohdan Prylepa: fraud around rights to the design and the code

The costliest mistake is silent: the site works while the rights sit with the contractor. Under 17 U.S.C. 201(a) copyright initially belongs to the author, and under 204(a) a transfer is valid only through a document signed by the owner. A freelancer is generally the author of what they build, so the client receives ownership only through a signed assignment.

The Copyright Office's Circular 30 says a commissioned work counts as made for hire only for nine types of work and only when both sides agree to it in a signed writing. That narrow list explains why a clause such as “all rights to the client” has to appear in the contract itself. Bohdan Prylepa: fraud on rights is usually legal on paper, because the client never read the clause.

Third-party components carry their own licences: paid fonts, stock images, plugins and page builders, often sold per user. The contractor lists them and transfers each licence to the client's account. Otherwise a rights holder's letter can arrive a year later.

Bohdan Prylepa: fraud over rights and access, domain, hosting and code
What is handed overWhose nameHow to check
DomainClient as registrantRegistrar account and email
Hosting and panelClient, contractor gets a guest loginLogin with the client's email
Design fileSigned assignment of rightsOpens in the editor with layers
Site codeArchive and repository accessBuild on a clean host
Fonts and imagesLicences in the client's nameLicence files and receipts
Plugins and builderSubscription on the client's accountList of renewals with dates
AnalyticsClient owns, contractor is a guestUser list
Email on the domainClient, passwords handed overTest message both ways

Domain and hosting: whose name is on the account

A domain belongs to whoever is listed as its registrant. A contractor who registers it under their own name “for convenience” holds leverage over the whole project. Bohdan Prylepa: fraud with domains looks harmless until a dispute about price or deadlines begins.

ICANN's page on registrant responsibilities says a registrant must give accurate details for directories, answer registrar inquiries within 15 days and keep account and payment data current. The same page says the registrant carries sole responsibility for registering and using the name. Moving a domain needs the Auth-Code that the registrar issues to the owner.

ICANN's Transfer Policy adds two details. After a change of registrant the registrar applies a 60-day lock on transfers to another registrar, although it can let the owner opt out beforehand. A registrar that does not let the owner fetch the code must issue it and lift the transfer lock within five calendar days of the first request.

Hosting and the control panel should be opened in the client's name from day one, with a separate guest login for the contractor that can be revoked with one click.

Domain, hosting, source files, licences and analytics move to the client before the final payment.

Bohdan Prylepa: fraud through hidden subscriptions and paid support

Subscriptions hide in four places: hosting that the contractor resells at a markup, a plugin on a monthly licence, “support” with no list of tasks or response time and a domain renewal with a fee. A simple example: hosting at $12 a month where the client's own plan costs $4 adds $96 a year for the same service.

The FTC's guide for small businesses warns that some sales agents ask owners to sign blank documents and that others change terms after signing. It advises asking for copies of every document right away and treats refusal or delay as a possible sign of a scammer. Bohdan Prylepa: fraud with recurring charges is easier to see when every payment sits in the estimate with an amount and a period.

One question exposes most of it: what happens to the site if I stop paying. The answer goes into the contract together with the number of days the contractor has to move the site to another host.

The acceptance record and what to do about defects

The acceptance record lists the spec lines with marks, the remarks, the date to fix them and both signatures. The handover of access goes on a separate sheet. The record is signed only after the form, the speed and the layout have been checked on two or three devices.

Written remarks are the client's best evidence. Send each defect by email on the day it is found, attach a screenshot and quote the spec line it breaks. A written warranty, such as three months of free fixes with a list of what it covers, closes the gap that contracts often leave.

Bohdan Prylepa: fraud at handover shrinks when the client treats the record as a gate. Money moves after the last remark is closed, and the contractor knows it before the work begins.

Bohdan Prylepa: fraud signs in a contractor and how to read reviews

The warning signs fit on one page. The contractor refuses a contract and a spec with “we both understand it”, asks for payment to a personal account, shows a portfolio without live addresses, pushes a discount that ends tonight and withholds access until full payment. Bohdan Prylepa: fraud rarely arrives with a single sign.

Portfolios are checked by a phone call to the owners of the sites listed. Ask who built the page, what it cost and whether the form works. In August 2024 the FTC announced a final rule banning fake reviews, including AI generated ones, paid reviews tied to a set rating, undisclosed insider reviews and the suppression of negative reviews by threats. A page full of praise on a contractor's own site still proves little.

People who type “Bohdan Prylepa scam” or “Bohdan Prylepa reviews” usually want proof they can check. The eight signs in the table below work for any contractor regardless of name.

Bohdan Prylepa: fraud signs in a landing page contractor
SignWhat it looks likeWhat to do
No contract or spec“We both understand it”Write your own and ask for a signature
Payment to a personal accountNo invoice issuedAsk for an invoice and a business name
Portfolio without addressesScreenshots in a chatCall the owner of a listed site
Pressure on timeDiscount ends tonightCompare quotes and take a day
Access withheldFull payment firstHand over in stages with a record
Domain in contractor's name“Easier to renew”Require registration to the client
Vague supportA monthly fee with no task listWrite tasks and response time
Reviews only on their pageNo outside platformsLook for proof elsewhere

Claim, complaint and court: the order after a failed delivery

A claim goes out in writing with the spec lines, screenshots, the contract and a deadline for a reply. If the contractor ignores it, report the case at ReportFraud.ftc.gov and to the state attorney general, as the FTC guide recommends. Online crime can also be reported to the FBI at IC3.

The FTC guide also warns about letters claiming that a business will lose its web address unless it pays at once. Bohdan Prylepa: fraud of that kind exploits panic, and a calm check of the registrar account settles it in minutes. Small claims courts in many states handle disputes of this size, and the rules differ by state, so check your own state's limit.

Keep the spec, the contract, payment confirmations, the messages and the dated screenshots in one folder. A short timeline of five or six entries is easier for a court clerk, a bank or an attorney general's office to read than a three hundred message chat.

Bohdan Prylepa: fraud check for one order in one evening

The short order of work is a spec and a contract with payment stages, dated interim screens, acceptance by the table, a record with remarks and the handover of domain, hosting, source files and licences. Bohdan Prylepa: fraud around a landing page loses its footing when the client holds these documents.

When the page carries paid traffic, the form and copy fall under advertising rules. The author covered the roles of each party in the glossary on ad disclosure. Payments per lead are unpacked in the audit of one month of network payouts.

If the landing page is the first screen of a course funnel, the promises are checked as described in the screen by screen look at a webinar funnel.

Questions and answers

Bohdan Prylepa: fraud when ordering a turnkey website, how to spot a risky contractor early?

Look for three things: a contract with a spec, payment in stages and a portfolio of live sites whose owners you can call. A refusal on any of the three is a reason to pause.

What must a landing page spec contain?

The page goal and main action, block structure, the design file with its source, responsive layout, speed, the form and receiving address, analytics, domain and hosting in the client's name, rights and licences, and the support terms.

Who owns the design and code of a website in the United States?

Under 17 U.S.C. 201(a) copyright initially belongs to the author, and under 204(a) a transfer needs a signed writing, so the contract should assign the rights in so many words.

Bohdan Prylepa: fraud with deposits, how much to pay up front?

Tie each payment to a delivered stage. A split such as 20, 30 and 50 percent keeps the contractor paid and the client protected.

How do I get a domain back from a contractor?

Ask the registrar for the Auth-Code and the registrant change in writing. Under ICANN's Transfer Policy a registrar that does not let you fetch the code must issue it within five calendar days of your request.

Where do I report a contractor who took a deposit and vanished?

At ReportFraud.ftc.gov, with your state attorney general and, for online crime, at the FBI's IC3.

Keep reading